Detailed Answer
Post-selection acceptance process: 1. Delivery check (model/quantity/accessories/certificates); 2. Visual inspection (no damage); 3. Installation and wiring (licensed electrician, per drawings); 4. Functional testing (buttons/directions/speed); 5. Safety testing (emergency stop/signal loss protection/interlock); 6. Range testing (on-site measurement); 7. Code-pairing isolation test; 8. Trial run (loaded for 1-2 weeks); 9. Operator training; 10. Sign and archive the acceptance form. LDER/XINGJIA provide acceptance support.
| Verification | Model / accessories / certificates |
| Testing | Function + safety + distance |
| Trial run | Loaded 1-2 weeks |
Note:Sign each item on the acceptance form and raise issues promptly.