Detailed Answer
Installation steps: 1. Power off (disconnect the main equipment power); 2. mount the receiver (bracket inside the control cabinet, away from VFDs/power cables); 3. wiring (power cable + relay output cables into the control circuit, verify contacts against the wiring diagram); 4. antenna installation (extend outside the cabinet, pointing vertically up); 5. power-on test (pair the transmitter → no-load trial → loaded trial); 6. emergency stop/loss-of-signal protection test. LDER LD series includes detailed wiring diagrams; Xingjia likewise. Installation must be performed by a certified electrician.
| Steps | Mount → wire → antenna → test |
| Location | In cabinet, away from interference |
| Requirement | Certified electrician |
Note:Power off before wiring; verify control voltage.