Detailed Answer
Warehouse remote control acceptance: 1. Full function check (keys/dual speed/E-stop); 2. Actual range test (100m+ inside the warehouse); 3. Pairing verification (independent); 4. Low-temperature test (cold storage models); 5. Documentation (manual/certifications); 6. Spare parts (batteries). LDER and XINGJIA provide acceptance support. On-site low-temperature testing is critical for cold storage models.
| Function | All keys + E-stop |
| Range | Measured in warehouse |
| Low temp | Cold storage test |
Note:Cold storage remotes must be acceptance-tested on site at low temperature.